Custom Size Plastic Formwork for Bridge & Tunnel Construction, High Load-Bearing Template

Still deciding? Get samples of $ !
Order Sample

Product Description

📋 Overview - Basic Information
Model NO.plastic formwork
CertificationISO
MaterialPlastic
TypeColumn Formwork
Usage Time80-120 Times
ColorYellow, White
Lateral Pressure60kN
Unit WeightAround 14kg/Sqm
📦 Product Description

Custom Size Plastic Formwork designed for Bridge & Tunnel Construction. This high load-bearing template offers exceptional durability and efficiency for modern construction projects.

Plastic Formwork Display 1
Plastic Formwork Display 2
📊 Product Parameters
Parameter Details
Modelplastic formwork
MaterialPP/ABS / 5mm copper free silver mirror
ShapeRectangular, Square
Standard Size1500mm X 700mm X 80mm
Other SizeCustomized available
Standard FeatureAdjustable assembly
Quality ControlFull QC system with production process records
Technical Drawing 1
Technical Drawing 2
🔧 Installation Instructions
01

When placing prefabricated parts, they must be placed on a flat site.

02

Pour the concrete into the mold and wait for different periods of time according to the sizes of the molds. (Our molds don't need release agent, and can be used at temperatures ranging from -20 ºC to 60 ºC)

03

Finally, it can be demolded by tapping gently with a wooden hammer to ensure that the mold will not be damaged.

04

The mold can be cleaned and prepared for reuse.

Installation Process
🏭 Production & Applications
Portfolio 1
Portfolio 2
Portfolio 3
Portfolio 4
Portfolio 5
Portfolio 6
🎊 Our Advantages
Professional Technology
Expert R&D for various prefabricated components.
Rich Experience
Over 10 years of R&D history applied to national key projects.
Strong After-Sales
Comprehensive support system to ensure customer satisfaction.
Patented Tech
Multiple patented supporting technologies for better service.
Strict Quality
Rigorous quality management system and cost control.
❓ FAQ
Q1. Are you a factory or trading company?
A1: We are a factory specializing in high-quality plastic formwork solutions.
Q2. How can I get your quotation?
A2: You can provide your project structural drawing or material list. Our engineering team will then provide a tailored formwork solution.
Q3. What are the payment terms?
A3: T/T or L/C at sight. A 30% deposit is required to start production, with the balance due before shipment.
Q4. How long is the production lead time?
A4: Usually within 15-20 days during normal seasons, and 25-30 days during peak periods.
Q5. Do you have a guarantee on product quality?
A5: Yes, we guarantee the quality of our products. You are also welcome to arrange third-party inspections at our factory.
Q6. What is the standard packaging method?
A6: Products are typically packed in bulk or on pallets, specifically optimized for container transportation.

Related Products